QC PROCEDURE FOR ELECTRICAL GROUNDING SYSTEM
TABLE OF CONTENTS
1. SCOPE
2. PURPOSE
3. DEFINITIONS
4. REFERENCES
5. SAFETY REQUIREMENTS
6. QA/QC REQUIREMENTS
7. METHOD OF PREPARATION
8. DOCUMENTATION
9. ATTACHMENTS
1. SCOPE
This Quality Control Procedure covers the new installed building and Substations in ______________ Project.
2. PURPOSE
The purpose of this procedure is to provide for the detailed requirements that shall be followed during Grounding system and Instrument Master Reference Grounding Installation.
3. DEFINITIONS
COMPANY : SAUDI ARAMCO
CONTRACTOR :
SUB CONTRACTOR:
PROJECT :
SAPMT : SAUDI ARAMCO PROJECT MANAGEMENT TEAM
SAPID : SAUDI ARAMCO PROJECT INSPECTION DIVISION
SAPOD : SAUDI ARAMCO POWER OPERATION DISTRIBUTION
4. REFERENCES
SAES-P-111 Grounding
SAES-P-104 Wiring Methods and Materials
SAES-P-100 Basic Power System Design Criteria
Saudi Aramco Library Drawing
IFC Drawing Detail G04
NEC Art. 250
5. SAFETY REQUIREMENTS
5.1. Necessary safe work permit shall be obtained. All person involved in these activities shall wear complete Personal Protective Equipment (PPE) in accordance with safe work requirements.
5.2. Barricades and Signboards shall be installed around the working area to restrict from other not involved in these activities.
6. QA/QC REQUIREMENTS
6.1. E&I Inspector shall verify all materials and tools as per SAES-P-111 Sec.5.2 A, B, C&D.
6.2. E&I QC Inspector shall carefully check the work execution against all relevant drawings, applicable standards and specifications, Codes and Manufacturing Instruction Manual.
7. METHOD OF PREPARATION
7.1. Experience Electrical Personnel to perform Grounding System Installation.
7.2. Familiar of Exothermic or CADWELD Manufacturer Manual and Instructions.
8. DOCUMENTATION
8.1. SAES-P-111 Grounding
8.2. SATIP-P-111-01 Grounding and Bonding
8.3. SAIC-P-3711 Grounding GES copper, copper-clad (Jacketed) Steel galvanized steel rod –installation
8.4. SAIC-P-3713 Grounding –GES/GEC –Exothermic (Thermite) Welding materials mold & tools installation
8.5. SAIC-P-3714 Grounding GES/GEC/EGC Hydraulic Compression Connector Installation
8.6. All inspection reports shall be filed at QA/QC department including test reports.
9. ATTACHMENTS
9.1. IFC Grounding System Drawing.
9.2. IFC Master Reference Grounding Drawing.
You may also like👇
- ARAMCO :: CBT QA/QC – Instrumentation Inspector Qualification Guideline
- PIPING Inspector Qualification Guideline Vol-2
- Saudi Aramco Cbt Exam Questions and Answers
- CBT EXAM E-BOOKS
- QA/QC ELECTRICAL Inspector Question & Answer Handbooks
- QA/QC E-books Category
- WELDING PROCEDURES (WPS) Neptune Energy Netherlands
- What is Pipe Rack?
- Five Types of concrete used in construction
- METHOD STATEMENT FOR METAL AND WOODEN DOORS || Aramco