SATIP INDEX - MECHANICAL
1 Pneumatic Pressure Testing : SATIP-A-004-01
Review of Pneumatic Testing Procedure - SAIC-A-2004
Filling & Pressurization for Pneumatic Testing - SAIC-A-2020
Visual Inspection of Pneumatic Test - SAIC-A-2021
Depressurization of Pneumatic Test - SAIC-A-2022
2 Pressure Testing-Hydrostatic Test of Plant Piping : SATIP-A-004-02
Review of Hydrostatic Pressure Testing Procedure for Plant Piping - SAIC-A-2001
Review of Test Packages - SAIC-A-2006
Review of Lay-up Procedures - SAIC-A-2007
Verification of Test Medium - SAIC-A-2008
Verification of Test Equipment and Test Instruments for Pressure Testing - SAIC-A-2009
Pre-Test Punch listing - SAIC-A-2010
Inspection of Pressure Test Preparation - SAIC-A-2011
Internal Cleanliness Inspection of Piping & Vessels - SAIC-A-2012
Inspection of Filling & Pressurization for Pressure Testing of Piping - SAIC-A-2013
Visual Inspection of Pressure Test - SAIC-A-2015
Pneumatic Testing of Reinforcing Pads - SAIC-A-2016
Depressurization & Disposal of Hydrotest Water - SAIC-A-2017
Lay-up Application for Piping and Vessels - SAIC-A-2018
3 Pressure Testing-Hydrostatic Test of Pipelines : SATIP-A-004-03
Review of Hydrostatic Pressure Testing Procedure for Pipelines - SAIC-A-2002
4 Pressure Testing of Pressure Vessels : SATIP-A-004-04
Review of Hydrotest Procedure for Pressure Vessels - SAIC-A-2003
Inspection of Filling & Pressurization for Pressure Testing of Vessels - SAIC-A-2014
Pre-Test Inspection of Pressure Vessels - SAIC-A-2025
5 Leak Testing Per SAES-A-004 : SATIP-A-004-05
Review of Leak Testing Procedure - SAIC-A-2005
Pressurization for Leak Testing - SAIC-A-2023
Inspection of Leaks for Tightness Testing - SAIC-A-2024
6 Intumiscent Fire Proofing : SATIP-B-006-02
Review of Intumiscent Fireproofing Material for Approval - SAIC-B-2001
Review of Installation Procedure for Intumiscent Fireproofing Material - SAIC-B-2002
Verification/Inspection of Intumiscent Fireproofing Material - SAIC-B-2003
Storage, Handling & Preservation of Intumiscent Fireproofing Materials - SAIC-B-2004
Performance Verification of Equipment & Applicators of Intumiscent Fireproofing Materials - SAIC-B-2005
Pre-Application Inspection of Intumiscent Fireproofing Materials - SAIC-B-2006
In-Process Inspection of Intumiscent Fireproofing Material Application - SAIC-B-2007
Post-Application Inspection of Intumiscent Fireproofing Material - SAIC-B-2008
Top Coating Application on Intumiscent Fireproofing - SAIC-B-2009
Final Inspection of Intumiscent Fireproofing Application - SAIC-B-2010
7 Portable Fire Protection Equipment Installation : SATIP-B-019-01
Material Receiving Inspection - Portable Fire Protection Equipment - SAIC-B-2011
Storage, Handling & Preservation of Portable Fire Protection Equipment - SAIC-B-2012
Portable Fire Extinguishers- Installation Inspection - SAIC-B-2013
Foam Generating Equipment - Installation Inspection - SAIC-B-2014
Special Fixed Extinguishing Equipment - Installation Inspection - SAIC-B-2015
Access and Platforms for Portable Fire Protection System - SAIC-B-2016
Re-Instatement of Portable Fire Protection System - SAIC-B-2017
8 Pressure Vessel Installation : SATIP-D-001-01
Review of Vessel Data Sheet & Safety Instruction Sheet - SAIC-D-2001
Receiving Inspection of Pressure Vessels- External - SAIC-D-2002
Receiving Inspection of Pressure Vessels- Internal - SAIC-D-2003
Receiving Inspection of Ladders, Platforms & other Structural Steel Attachments of Vessels and Tanks - SAIC-D-2004
Vessel Storage, Handling & Preservation - SAIC-D-2005
Equipment Pre-Installation Inspection - SAIC-D-2006
Equipment Installation-Alignment & Elevation Survey (Vertical Vessels ) - SAIC-D-2007
Vessel Trim Installation Inspection - SAIC-D-2008
Tray Installation in Vessels - SAIC-D-2009
Tray Testing (Vessels & Columns) - SAIC-D-2010
Vessel Closure Inspection - SAIC-D-2011
Final Inspection of Vessels (Re-Instatement) - SAIC-D-2012
Catalyst/Packing Installation - SAIC-D-2013
Receiving Inspection of Tanks- External - SAIC-D-2015
Receiving Inspection of Tanks- Internal - SAIC-D-2016
Inspection of Buried Tank Installation - SAIC-D-2017
Inspection of Under-Tank Leak Detection & Sub-Grade Protection - SAIC-D-2018
Inspection of Above Ground Tank Installation - SAIC-D-2019
Tank Trim Installaton - SAIC-D-2020
Final Inspection of Tank Installation - SAIC-D-2021
Equipment Installation-Alignment & Elevation Survey (Horizontal Vessel) - SAIC-D-2022
8.1 Shop Fabrication Storage Tank Installation : SATIP-D-109-01
Review of Tank Data Sheet & Safety Instruction Sheet - SAIC-D-2014
9 Heat Exchanger Installation - Shell and Tube : SATIP-E-004-01
Review of SIS for Shell & Tube Heat Exchanger - SAIC-E-2001
Receiving Inspection of Shell & Tube Heat Exchangers - SAIC-E-2002
Storage, Handling & Preservation of Heat Exchangers - SAIC-E-2003
Nitrogen and Pearlite Application on BAHE Frame - SAIC-E-2011
9.1 Air Cooled Heat Exchanger - Fin Fan Cooler : SATIP-E-007-01
Review of SIS for Air Cooled Heat Exchangerr - SAIC-E-2004
Receiving Inspection of Air Cooled Heat Exchanger - SAIC-E-2005
Fin Fan Cooler Shroud Assembly Inspection - SAIC-E-2006
Inspection of Fan Installation for Air Cooled Heat Exchanger - SAIC-E-2007
Re-instatement of Air Cooled Heat Exchanger. - SAIC-E-2008
Vessel Internal Cleanliness of this Air Cooled Heat Exchanger - SAIC-E-2009
In-Situ Strenght Test of Fin Fan Coolers (per SAES-A-004, Par. 6.4.5) - SAIC-E-2010
10 Fired Heaters Field Installation : SATIP-F-001-01
Review of Erection Plan for Fired Heaters - SAIC-F-2001
Review of Drawings for Ultrasonic Thickness Record of the Fired Heater's Component - SAIC-F-2002
Review of Data Sheet and Safety Instruction Sheet for Fired Heater - SAIC-F-2003
Material Receiving Inspection of Fired Heater & Accessories - SAIC-F-2004
Handling, Storage and Preservation of Fired Heater and Its Components - SAIC-F-2005
Installation of Fired Heater & Components - SAIC-F-2006
Closure Inspection of Heater Boxes - SAIC-F-2007
Final Punch Listing of Fired Heater and its Components - SAIC-F-2008
10.1 Forced Draft Fan : SATIP-F-001-02
Review of Safety Instruction Sheet for Forced Draft Fan - SAIC-F-2009
Material Receiving Inspection of forced Draft Fan, Driver and Ductworks - SAIC-F-2010
Storage, Handling & Preservation of Forced Draft Fam and its Components - SAIC-F-2011
Installation of Ducting for Forced Draft Fan - SAIC-F-2012
Installation of Auxiliary Piping of Forced Draft Fan - SAIC-F-2013
Final Punch Listing of Forced Draft Fan and Its Components - SAIC-F-2014
11 Incinerators : SATIP-F-001-03
Material Receiving Inspection of Incinerators - SAIC-F-2015
Storage, Handling and Preservation of Incinerator and its Components - SAIC-F-2016
Installation of Incinerator and Mechanical Components - SAIC-F-2017
Closure Inspection of Incinerator - SAIC-F-2018
Final Punch Listing of Incinerator - SAIC-F-2019
12 Power Boiler - Packaged Type : SATIP-F-001-04
Review of Data Sheet and Safety Instruction Sheet for Boiler - SAIC-F-2020
Receiving Inspection of Boiler and its Mechanical Components - SAIC-F-2021
Receiving Inspection of Power Piping and Auxiliaries - SAIC-F-2022
Storage, Handling and Preservation of Boiler and its Mechanical Components - SAIC-F-2023
Lay-Up of Boiler Tubes and Drums - SAIC-F-2024
Lay-Up & Preservation of Boiler's Furnace - SAIC-F-2025
Flushing of Boile Tubes and Associated Piping and Vessels - SAIC-F-2026
Installation of Economizer Section - SAIC-F-2027
Installation of Bioler Trim Components - SAIC-F-2028
Installation of Smoke Stack - SAIC-F-2029
Boiler & Piping Re-Instatement - SAIC-F-2030
Final Punch Listing of Boiler and its Accesories - SAIC-F-2031
13 Elevated Flare--Stack, Tip & Igniter : SATIP-F-007-01
Review of Flare Stack & Flate Tip Lifting Plan - SAIC-F-2032
Receiving Inspection of Flare Stack, Flare Tip and Igniter - SAIC-F-2033
Storage, Handling and Preservation of Flare Stack, Tip & Igniter - SAIC-F-2034
Final Punch Listing of Flare Stack, Tip & Igniter - SAIC-F-2035
14 Centrifugal Pump : SATIP-G-005-01
Review of Safety Instruction Sheet for Centrifugal Pump - SAIC-G-2001
Receiving Inspection of Centrifuagal Pumps - SAIC-G-2002
Storage Handling & Preservation of Centrifuagal Pumps - SAIC-G-2003
Inspection of Auxiliary Piping Installation for Pumps - SAIC-G-2004
Pump Suction and Discharge Piping Installation - SAIC-G-2005
Driver Shaft/Coupling Alignment for Rotating Equipment - SAIC-G-2006
Final Punch Listing of Centrifugal Pumps - SAIC-G-2007
Equipment Mounting Plate Installation (Prior to Grouting) - SAIC-G-2021
Final Pump/Driver Alignment - SAIC-G-2022
15 Positive Displacement Pump : SATIP-G-006-01
Review of Safety Instruction Sheet for Positive Displacement Pump - SAIC-G-2008
Receiving Inspection of Positive Displacement Pump - SAIC-G-2009
Storage Handling & Preservation of Positive Displacement Pump - SAIC-G-2010
16 Lubrication, Shaft Sealing and Oil System for Rotating Equipment : SATIP-G-115-01
Review of Chemical Cleaning and Flushing Procedure For Lubrication, Shaft Sealing and Oil Systems for Rotating Equipment - SAIC-G-2011
Receiving Inspection of Mechanical Components of Lubrication, Shaft Sealing and Oil Systems for Rotating Equipment - SAIC-G-2012
Storage, Handling & Preservation of Lubrication, Shaft Sealing and Oil Systems for Rotating Equipment - SAIC-G-2013
Installation of Mechanical Components of Lubrication, Shaft Sealing and Oil Systems for Rotating Equipment - SAIC-G-2014
Final Punch Listing of Lubrication, Shaft Sealing and Oil Systems for Rotating Equipment - SAIC-G-2015
Pre-Cleaning Inspection of the Lube and/or Seal Oil System - SAIC-G-2016
Mechanical Cleaning of Lube and/or Seal Oil System - SAIC-G-2017
Chemical Cleaning of Lube and/or Seal Oil System - SAIC-G-2018
Flushing and Cleanliness Inspection of the Lube and/or Seal Oil System - SAIC-G-2019
Final System Re-Instatement and Inspection of the Lube and/or Seal Oil System - SAIC-G-2020
17 Cement Lining of Pipes and Fittings : SATIP-H-002-01
Review of Cement Lining Procedure and Inspection Plan - SAIC-H-2001
Receiving Inspection of Raw Materials for Cement Lining - SAIC-H-2002
Storage, Handling and Preservation of Raw Materials for Cement Lining - SAIC-H-2003
Verification of Cement Lining Equipment - SAIC-H-2004
Pre-Application Inspection of Cement Lining - SAIC-H-2005
In-Process Inspection of Cement Lining - SAIC-H-2006
Post Application Inspection of Cement Lining - SAIC-H-2007
Final Inspection for Acceptance of Cement Lined Pipe/Piping - SAIC-H-2008
18 External FBE Coating of Field Welded Joints : SATIP-H-002-02
Review of Field Applied FBE Coating & Repair Procedure - SAIC-H-2009
Review of Coating Personnel Qualification and Certification - SAIC-H-2010
Material Inspection of FBE Powder & Abrasives - SAIC-H-2011
Storage, Handling and Preservation of FBE Powder and Abrasive Materials - SAIC-H-2012
Inspection and Performance Verification of FBE Powder Application Equipment - SAIC-H-2013
Surface Preparation for Ext FBE on field girth welds - SAIC-H-2014
In-Process Inspection of FBE Powder Application on Ext. Field Girth Welds - SAIC-H-2015
Holiday Testing and Inspection - SAIC-H-2016
In-Process Inspection of Repair on External FBE Coating - SAIC-H-2017
Final Inspection Prior to Backfill - SAIC-H-2018
19 Pipe Internal Coating and Installation : SATIP-H-002-08
Surface Preparation of Internal Pipe Ends/Joints for FBE Coating - SATR-H-2011
In-Process Inspection of Internal FBE Coating Application of FGW's - SATR-H-2012
20 Hot Tap Installation : SATIP-L-052-01
SAEP-311, Appendix I – Ultrasonic Thickness Measurements for Tie-In & Hot Tap (Modify for Projects Use) - SATR-NDE-2007
21 Structural Steel, Piperack & Miscellaneous Steel Supports and Aluminum Structures : SATIP-M-001-01
Pre-Installation Procedure Verification Testing of Turn-of-Nut Method (ASTM A325 or ASTM A490 Bolts) - SATR-M-2003
22 Verification Testing : SATIP-M-001-02
Pre-Installation Procedure Verification Testing of Calibration Wrench (ASTM A325 or ASTM A490 Bolts) - SATR-M-2004
23 Welding of Structural Steel and Miscellaneous Steel-On Shore : SATIP-M-001-03
Pre-Installation Procedure Verification Testing of Direct Tension Indicator (ASTM A325 or ASTM A490 Bolts) - SATR-M-2005
24 Castable Refractory Installation : SATIP-N-110-01
Refractory Sample Test Report - SATR-N-02001
25 Extreme Erosion Rsistant Refractory Installation : SATIP-N-120-01
Sample Mixing/Batching Report - SATR-N-02002
26 Leak Detection (NDE) : SATIP-NDE-LD-01
Leak Detection Test Report (NDE)- Tank Floor & Roof) - SATR-NDE-LD001
27 Welding of On-plot Piping : SATIP-W-011-01
PWHT Table/Schedule - SATR-W-2004
PWHT Report Form - SATR-W-2005
Daily Weld Fit-Up Inspection Report - SATR-W-2006
Daily Weld Production Report - SATR-W-2007
Weld Summary Sheet - SATR-W-2008
Welding Rod Oven (Storage, Baking, & Portable) Calibration Report - SATR-W-2009
Welding Consumable Issuance Record - SATR-W-2010
Welding Machines Verification Report - SATR-W-2011
Hardness Test Report - SATR-W-2012
Weekly Weld & Welder Repair Rate Report - SATR-W-2013
28 Welding of Pipelines : SATIP-W-012-01
Temperature Tie-In Welding Report - SATR-W-2014
Inspection/Verification of Weld Modification or Repair (Re-Work) after Weld Acceptance - SAIC-W-2036
Inspect Welding of Socket Joint and Seal Welding Threaded Jts. - SAIC-W-2037
Review of Welding Procedure for Pipelines - SAIC-W-2038
Review of Welding & Welding Operator Certifications - SAIC-W-2039
Review of Method Statement & WPS for Weld Repair - SAIC-W-2040
Review of Procedure for Weld Joint Identification System - SAIC-W-2041
Review of Post Weld Heat Treatment Procedure - SAIC-W-2042
Review of Production Weld Hardness Testing Procedure - SAIC-W-2043
Receiving Inspection of Welding Consumables - SAIC-W-2044
Verification/Calibration of Welding Machines - SAIC-W-2045
Control of Welding Consumables(Storage/Handling/Issuance) - SAIC-W-2046
Buttering and/or Weld Buildup - SAIC-W-2047
Pre-Welding Inspection - SAIC-W-2048
In-Process Welding Inspection - SAIC-W-2049
Post-Welding Visual Inspection - SAIC-W-2050
Weld Repair Inspection - SAIC-W-2051
Post-Weld Heat Treatment Application for Plant Piping & Pipelines - SAIC-W-2052
Verification of Hardness Testing Application & Test Result - SAIC-W-2053
Production Weld and Welder Repair Rate Assessment - SAIC-W-2054
29 Welding of Overlays and Cladding Restoration : SATIP-W-014-01
Weld Overlay Chemical Composition Test Report - SATR-W-2015
Ferrite Content Test Report-SS - SATR-W-2016
30 Installation of Metering Skid for Hydocarbon Gas : SATIP-Y-100-02
Receiving Inspection-Metering Skid - SAIC-Y-2001
Storage, Handling & Preservation of Metering Skids and Its Components - SAIC-Y-2002
Inspection of Mechanical Component Installation and/or Assembly - SAIC-Y-2003
Piping Re-Instatement of Metering Skid - SAIC-Y-2004