HVAC / Plumbing QC Inspector Online Free Mock Test-2
Get online test series along with free mock tests for HVAC / Plumbing QC-Inspectors / Engineers and other exams.
Mock Test-2
Number of Questions - 40
Notes : The Quiz makes In multiple-choice quiz, there is a timer for 50 seconds/question.When 10 seconds is left, automatically the timer is red in color.finally, when the time is end,the correct answer is automatically shown.
>> CLICK HERE <<
Example Questions:
- Illuminated exit signs shall be manufactured and installed in accordance with ___________ requirements.
- Bare Copper Grounding Conductors shall be buried in minimum depth of _______?
- Switch gear, control gear, switch boards, switch racks, and panel boards
- Minimum conductor size for cables rated 600V and below (power)
- Minimum depth of burial for direct buried cables rated over 35KV
- What is the standards used for the installation of cable trays
- Bare Copper Grounding Conductors shall be buried in minimum depth of _______?
- Cables can be used to extend the main bus of Switch gear, control gear, switch boards, switch racks, and panel boards
- Minimum conductor size for cables rated 600V and below (power)
- Minimum depth of burial for direct buried cables rated over 35KV
Top 40 Typical Interview Questions and Answers for HVAC / Plumbing Quality Control Engineer | HVAC / Plumbing Site Inspector | QA/QC Engineer | QC HVAC / Plumbing Inspector