Civil QC Inspector MCQ's Online Free Mock Test-3
Get online test series along with free mock tests for Civil QC-Inspectors / Engineers and other exams.
Mock Test-3
Number of Questions - 30
Notes : The Quiz makes In multiple-choice quiz, there is a timer for 50 seconds/question.When 10 seconds is left, automatically the timer is red in color.finally, when the time is end,the correct answer is automatically shown.
Example Questions:
- Using Proper vibrating in concrete as ……….
- Clear space on all sides of excavation shall be at least…………..
- The final finished right of way shall be at least …...meters wide and …………. meters in Sabkha areas.
- Temperature test shall be made with a frequency of not less than one test for every of concrete on each day, or 1 test each day for each class of concrete delivered. (ASTM C94-04, Sec. 16.5)
- Variation in elevation of the tops of anchor bolts shall be equal to or less than (AISC .1c)
- The hot mix asphalt concrete shall be placed only when the air temperature is above ………………. and it is not foggy, rainy and the existing surface is free of moisture.
- Granular base materials shall be placed in layers of uniform thickness with approved spreaders not exceeding …….. after compaction
- The prime coat shall be applied at a temperature between ... ... .... .. .............for MC-70
- Minimum Compressive Strength of pre-packaged cement based grout at 28 days shall be
- The minimum thickness of grout between the foundation and base plates shall besteel 1m and Packings to be provided